日本中文字幕视频在线看-日本中文字幕网站-日本中文字幕一区二区-日本中文字幕一区二区高清在线-日本中文字幕一区二区有码在线-日本中文字幕永久在线

歡迎訪問永誠廣建公路材料(山東)有限公司網站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現在所在的位置 :首頁 - 新聞中心 > 公司新聞

公司新聞

冷補瀝清生產過程中要特別注意的事情

來源:http://www.yuanchuodian.cn/ 日期:2023-01-09
冷補瀝青是公路施工常常應用到的材質,應用次數特別高,并且應用后的作用也特別明顯,安全駕駛更穩定、地面更美觀大方、使用年限更長、修復起來也更便于,也由于這種優勢的存有,該材質特別受大家喜愛,那麼你對該商品的生產制造有哪些掌握嗎?下邊濟南瀝青生產廠家就為各位簡易介紹一下冷補瀝清生產過程中須要特別注意的事情吧。
Cold patched asphalt is a material often used in highway construction. It has been used for a very high number of times, and has a particularly obvious effect after application. It is more stable for safe driving, more beautiful and generous ground, longer service life, and easier to repair. Because of this advantage, this material is particularly popular. What do you know about the production of this product? Next, Jinan asphalt manufacturer will briefly introduce the matters needing special attention in the production process of cold patching asphalt.
1、制得石油瀝青的加溫的溫度不能高過140℃。在制得全過程中,先加上柴油機,再放進添加劑。改性材料后的瀝清溫控在100-120℃中間,攪拌均勻。
1. The heating temperature of petroleum asphalt shall not be higher than 140 ℃. In the whole process of preparation, the diesel engine is added first, and then the additives are added. The asphalt temperature of the modified material shall be controlled between 100-120 ℃ and stirred evenly.
2、攪拌時,倘若石頭是干的,冷補瀝青可以用強制性式攪拌裝置攪拌。當它不干躁時,可以用文火或無火的攪拌裝置混和,如此一來可以控制成本。干躁的溫度不能高過80℃。
2. When mixing, if the stone is dry, the cold patched asphalt can be mixed with a mandatory mixing device. When it is not dry, it can be mixed with a slow fire or a flameless stirring device, so that the cost can be controlled. The temperature of dryness shall not be higher than 80 ℃.
濟南瀝青生產廠家
3、生產制造出來的冷補瀝清用布袋子計量器包裝,有益于儲存和運輸,可以提升儲存時間,為財務核算產生穩定的根據。
3. The cold make-up asphalt produced by the manufacturer is packed with cloth bag metering device, which is beneficial to storage and transportation, can improve the storage time and generate a stable basis for financial accounting.
4、堿石是有效的挑選,礦渣微粉的含水量小于2%,油石比可降低0.3-0.5%。
4. Alkali stone is an effective selection. The water content of slag powder is less than 2%, and the oil stone ratio can be reduced by 0.3-0.5%.
5、冷補瀝青進深125px以上的基坑應逐步壓實。填平時要均勻,比地面高0.5-37.5px。搗實后,在坑的表面均勻鋪地上一層層石頭或細沙,消除整潔,使細沙添充坑的表面空隙。
5. The foundation pit with cold patched asphalt deeper than 125px shall be compacted gradually. The filling shall be even, 0.5-37.5px higher than the ground. After tamping, the surface of the pit shall be evenly paved with layers of stones or fine sand to eliminate tidiness and make the fine sand fill the surface space of the pit.
以上就是問題“冷補瀝清生產過程中要特別注意的事情”的相關解答內容了,您對此有怎樣的問題或者需求,可以隨時來我們網站http://www.yuanchuodian.cn進行了解咨詢!
The above is the answer to the question "What should be paid special attention to during the production of cold fill asphalt". If you have any questions or needs, you can come to our website at any time http://www.yuanchuodian.cn Get to know!
  • 上一條:不同路面機械設備的使用方式
  • 下一條:水穩攪拌站的修理方法
  • 相關產品:

    主站蜘蛛池模板: 四虎永久在线精品 | 欧美日韩第一区 | 99国产精品热久久久久久 | 久久终合 | 被男人吃奶很爽的毛片两男一女 | 欧美一级片在线观看 | 日本久久久久久久 | 亚洲高清中文字幕精品不卡 | 91精品国产综合久久婷婷 | 国产成人视屏 | 国产人成午夜免费噼啪视频 | 精品欧美亚洲韩国日本久久 | 欧美专区亚洲专区 | 麻豆日韩区久久综合 | 亚洲精品一区二区 | wwwxxx日本人| 欧美日韩视频在线第一区二区三区 | 一个人看的日本免费视频 | 免费无毒片在线观看 | 99热国产精品 | 亚洲国产成人va在线观看网址 | 最近中文字幕在线 | 中文 | 亚洲欧美色图 | 久久香蕉综合精品国产 | 在线性视频 | 成人在线精品视频 | 人人看人人搞 | 国产欧美日韩三级 | 女同做爰全程免费网站 | 久久午夜影院 | 午夜看看 | 久久精品国产免费高清 | 色爱综合网欧美 | 日韩精品不卡 | 九一国产在线观看免费 | 久久91这里精品国产2020 | 亚洲欧美日韩在线线精品 | 欧美激情亚洲一区中文字幕 | 五月婷婷激情视频 | 国产精品一区二区资源 | 久久国产经典 |